Cal Steel Group is the light gauge steel, modular & structural production arm of TESH Group
A TESH Group Company Request a Quote
Scope: Modular
Volumetric // Delivered
Home/Capabilities/Modular & Volumetric

Modular Volumetric Construction

Pre-engineered modules built off-site in controlled factory conditions, using the same materials, codes, and standards as conventional construction, delivered and assembled on-site.

Volumetric modular in the field

Whole buildings, delivered as finished steel modules.

The capability and the proof in one place: watch an 84-unit development craned and set on site, then see the owned production stack that builds those modules, from master steel coil to finished box.

Affordable housing · 84 units · with ABS

Factory-finished light gauge steel volumetric modules, craned and set on site in days rather than months. Delivered in collaboration with Advanced Building Systems (ABS).

Master coil to finished box

Owned production, from steel coil to set module.

Cal Steel Group owns the production stack behind every module. As the modular arm of TESH Group, we slit master coil into light gauge steel, roll-form profiles, panelize walls, and assemble complete volumetric units, with design and permitting from NAXA and residential products from Lytemods.

01

Master coil slitting & roll-forming

Master steel coil is slit to width and roll-formed into structural studs, tracks, and profiles on our own line, with gauge and dimensions held to engineered spec.

02

Panelized walls & components

Profiles are framed into engineered wall, floor, and roof panels, squared and fastened in the shop, then bundled for flat-pack delivery and on-site erection.

03

Complete volumetric modular units

Panels are assembled into finished three-dimensional modules, framed and closed in under controlled conditions, ready to crane onto a prepared foundation.

04

Wet-room pods & prefab assemblies

Bathrooms, MEP racks, and other repeatable assemblies are built as drop-in pods, cutting field labor and trade stacking once the structure is set.

The sequence below follows that same 84-unit build, from steel framing and sheathing in the factory, to finished modules wrapped and staged in the yard, to the crane set on site. Click any frame to enlarge.

Modular & Volumetric

Whole rooms, built in the factory, set in days.

We build complete volumetric modules (floors, walls, MEP, and finishes) in our controlled facility, then deliver and set them on your foundation. For single-family homes and larger volumetric projects, the building is mostly finished before it reaches the site, then craned into place in a fraction of the time a site build takes.

Built in parallel with your site

Modules are manufactured while the foundation and sitework happen, compressing the overall schedule.

Set in days, not months

Finished modules are craned and connected on the prepared foundation in a matter of days.

Factory quality control

Climate-controlled assembly and inspection deliver consistent, repeatable quality.

Less weather risk

Most of the build happens indoors, cutting weather delays and on-site labor.

Steel-framed & fire-resistant

Light-gauge steel is non-combustible, termite-proof, and dimensionally stable.

Permanent or relocatable

Set permanently or relocate as needs change, from a single ADU to multi-unit.

A complete steel-framed volumetric module with yellow DensGlass exterior sheathing and a framed window opening, built on the factory floor
Complete volumetric unit · framed, sheathed & roughed in on the factory floor
Multiple finished volumetric modules staged in a row on the factory floor
Modules staged on the factory floor
A steel-framed volumetric module with MEP and fire sprinkler lines roughed in
Steel frame & MEP roughed in
Interior wall panels of a module with taped and finished drywall inside the factory
Interior finishes completed indoors
A complete volumetric module on casters, ready to move through the factory
Complete unit, ready to ship
20 to 40%
Lower cost than conventional construction
30 to 50%
Faster build time, factory work runs parallel to site
~90%
Complete when modules leave the factory
Days
To crane and set on a prepared foundation, not months

Cost and schedule ranges reflect industry benchmarks for volumetric modular construction.

How it works

A four-step path from design to set.

01

Design & Engineering

Modules engineered for manufacture, transport, and on-site assembly.

02

Permits & Approvals

Code-compliant documentation and approvals, coordinated up front.

03

Off-Site Building

Modules built in parallel with site work, in controlled factory conditions.

04

On-Site Foundation & Assembly

Finished modules delivered and set on the prepared foundation.

What we build modular

Permanent and non-permanent modular projects.

01

Modular Housing

Single and multi-family modular homes and ADUs delivered as finished volumetric units.

02

Classrooms & Education

Mobile classrooms and educational facilities, deployed quickly and built to code.

03

Portable Offices

Permanent and non-permanent office space for commercial and job-site use.

04

Military & Institutional

Rapid, durable modular construction for military and institutional programs.

05

Affordable & Public-Sector

Repeatable, scalable modular systems for housing programs and agencies.

06

Custom Volumetric

Wet-room pods, prefabricated assemblies, and custom volumetric scopes.

Start your project

Exploring modular for your next build? Let's talk.